Under construction · Windows going in

1708 Collier

Three modern 3-story homes · Corner of Collier & Garner · Zilker, 78704

1708 Collier — the three modern homes at dusk, a design rendering of the finished project 1708 Collier · the three homes · design rendering
Aerial view — three detached homes with private gardens and roof decks From above · three detached homes, each with its own garden
Homes
33 stories each
Sizes
1,420–1,501sq ft conditioned
Each home
3 bd · 2.5–3.5 badetached homes
Est. listing
Spring 2027Mar–Apr 2027

Where the build stands today

Windows going in on Homes 1 & 3 · Home 2 finishing framing
LandDesignPermitBuildFinishList
Three homes, one corner

Pick your home.

Three independent 3-story homes, each with its own entrance, private balconies, and roof access — sold separately. Ten minutes to downtown and the tech corridor; a short walk to Zilker Park, Barton Springs, and the restaurants of South Lamar & South First. Each home is available for sale or for lease — we’re accepting early reservations from tenants planning a 3-year-plus stay. Sizes and details below are from the approved drawings.

Home 1 exterior
Home 1

1,501 sf

3 stories · 3 bd / 2.5 ba

  • Floors464 / 517 / 512 sf
  • Bed / bath3 bd · 2.5 ba
  • Top floorMaster suite + WIC
305 sf rooftop terrace + top-floor master suite
See inside Home 1 →
Home 2 exterior
Home 2

1,420 sf

3 stories · 3 bd / 3.5 ba

  • Floors397 / 511 / 512 sf
  • Private balcony410 sf
  • ParkingCovered carport
Ground-floor guest suite + 3.5 baths
See inside Home 2 →
Home 3 exterior
Home 3

1,452 sf

3 stories · 3 bd / 2.5 ba

  • Floors505 / 488 / 459 sf
  • Private balcony226 sf
  • Top floorMaster suite + office
Top-floor office + covered patio
See Home 3 in 3D →
Lot
6,765 sf corner
Frontage
Collier × Garner
Heritage trees kept
4 protected
Built
2027 · new

Figures from the City of Austin–reviewed record set (SmallHouse Solutions). Bed/bath verified against each home's floor plans. Price on release.

Inside Home 1

Step inside Home 1.

Walk through floor by floor — designer renderings of the home as it's being built. Home 1 is the fully designed example; Homes 2 & 3 share the same language.

3D tourWalk through Home 1 yourself — drag to look around, tap through room to room.
Open the full 3D tour ↗
01 Ground floor · living
Home 1 ground floor plan

The layout

Three floors. Living all on the ground, bedrooms above, master suite up top — with private outdoor space on every level.

  • Ground: open kitchen with pantry, living, powder room, covered porch & patio
  • Second: two bedrooms + a shared bath
  • Third: master bedroom with ensuite & walk-in closet
  • Balconies on the 2nd and 3rd floors
  • Private 305 sf rooftop terrace
02 Second floor · bedrooms
03 Third floor · master suite
ROOF Rooftop terrace · 305 sf

Interior renderings by the project designer; finishes illustrative and subject to change.

Inside Home 2

Step inside Home 2.

Designer renderings of Home 2 — 1,420 sf, 3 bd / 3.5 ba, with a ground-floor guest suite and a private rooftop terrace.

3D tourWalk through Home 2 yourself — drag to look around, tap through room to room, all three levels.
Open the full 3D tour ↗
01 Ground floor
02 Second floor
03 Third floor
ROOF Rooftop terrace

Interior renderings by the project designer; finishes illustrative and subject to change.

Inside Home 3

Step inside Home 3.

Three stories, a top-floor master suite with its own office, and a 226 sf private balcony — walk the whole home in 3D.

3D tourWalk through Home 3 yourself — drag to look around, tap through room to room.
Open the full 3D tour ↗

Like what you see? Follow Home 3 →

01 Ground floor · living
02 Second floor · bedrooms
03 Third floor · master & office
04 Rooftop terrace

Stills taken from the Home 3 interactive 3D tour; finishes illustrative and subject to change.

Where we started

From an empty corner to three homes.

The original cottage at 1708 Collier before demolitionBefore · through May 2026
The original cottage at Collier & Garner — it stood here through May 2026.
The cleared and graded lot, ready for foundationThen · June 2026
Cottage down and lot graded in June 2026 — heritage trees kept.
Two homes wrapped in Tyvek and a third still framing, late October 2026Now · October 2026
Two homes wrapped and weather-tight, a third still framing — late October 2026.
Smart & connected

Tech-ready the day you move in.

Built for people who work in tech and live for the city — every home comes standard with a full Samsung appliance suite, whole-home security, and an EV charger. One brand, one app, no retrofits, no subscriptions required.

Samsung Bespoke kitchen

Fridge, gas range, dishwasher & microwave — all Samsung, all in one SmartThings app. Preheat on the drive home, get alerts from the app.

Samsung connected laundry

Smart washer & dryer with remote start and cycle-done notifications — same app, no extra accounts.

Locks, doorbell & cameras

Keyless entry and exterior cameras you can check from anywhere.

Level-2 EV charger

At the carport, on its own circuit — full charge overnight.

Gigabit fiber & WFH rooms

Wired for real work-from-home — including Home 3’s dedicated office.

Smart climate

Learning thermostat with per-floor scheduling.

Every appliance is Samsung, controlled from the single SmartThings app — all standard inclusions, not upgrades.

The streetscape

The corner, finished.

Design illustrations of the fence and streetscape — black horizontal slats between limestone piers, LED cap lighting, and the 1708 address wall at the corner of Collier & Garner.

Collier Street frontage at dusk — slat fence, lit piers and the 1708 address wall, design illustration
Collier St. frontage at dusk — Type A fence, address wall and walk gate
Aerial view of the fenced corner lot at Collier and Garner, design illustration
The corner from above — gates, driveways and protected trees
Walk gate between limestone piers at night with LED cap lighting, design illustration
Walk gate at night — LED pier caps and landscape lighting
Aerial concept of the three homes — private gardens, decks and roof terraces, design illustration
From above — three private gardens, roof decks and the shared green heart of the corner
Buyer selections

Make it yours.

Buy during construction and the finishes are still yours to choose. Work with our designer to personalize five areas of your home — then we build it that way.

Selection window open Selections close when drywall begins — est. fall 2026. After that, finishes are fixed. Reserve a design session →
Finish preview

Previews are concept illustrations. Final materials, colors and pricing are confirmed at your design session.

Under contract? Request a change.

Buyers who have signed can revise material & color selections while the window is open — submit below and we’ll confirm feasibility and any cost difference within 2 business days.

Window open · closes at drywall

Requests received after the window closes can’t be guaranteed. Structural and window/door changes are not part of this program.

Build diary

Framing, day by day.

Since the frames started going up we’ve been walking the site almost daily — here’s the build growing in near-real time, newest first. Photos are added after every site walk; tap any photo to zoom.

Nov 11, 2026

Windows going in

The first glass is in. Black-framed windows now sit in the openings of the front home, and the rest are staged inside, each one leaning beside the opening it belongs to. Window installation on Homes 1 and 3 is expected to wrap up in about three days, while Home 2 finishes its remaining framing. Shot this evening after the crew left.

The homes from the street at dusk — the front home wrapped with its first windows installed, a wrapped home behind it and the third still in framing
Inside an upper-floor room — a newly installed black-framed window looking out to the trees, the next window staged by its opening
The terrace level — a window waiting beside its opening, treetops and the neighborhood beyond
Looking through the top floor from the terrace opening — framed rooms, roof trusses overhead, the stairwell open below
An upper-floor room under the roof trusses — framed walls and plumbing stubbed in for a bathroom
Oct 30, 2026

Two wrapped, one climbing

The three homes from the street — two wrapped in Tyvek, brick and metal roofing staged in front, late October 2026
Between the two wrapped homes — the shared lane, vent pipes rising from the slab
Plumbing rough-in — PEX hot and cold lines and PVC drains inside the framed walls
Inside the frame — the staircase up, kitchen rough plumbing stubbed through the slab
The third home still in open framing beside its wrapped neighbors
Sep 29, 2026

Wrapped and ready

One day after the walls closed in, Home 1 went from sheathing to sealed — Tyvek HomeWrap now skins the full three-story shell, every window opening cut and waiting for glass. From the street the first house already reads finished: crisp white wrap, dark openings, the exact shape from the renderings. Behind it, Homes 2 and 3 keep climbing through their framing with the roof trusses overhead. Weatherproofing first, beauty later — but tonight it already looks like both.

Home 1 wrapped in Tyvek HomeWrap, window openings cut, framing rising behind
The wrapped three-story shell of Home 1 beside the open frames of Homes 2 and 3
Evening view of the Tyvek-wrapped Home 1 with roof framing climbing behind
Sep 28, 2026

The walls close in

Sunday walk. Home 1 is closing in — sheathing wraps the walls, window openings are cut and waiting for glass, and weather wrap is going on where the shell is complete. Up top the third floor still stands open to the sky while the crew frames the roof. From the lane the whole row reads at once: three volumes sharing one walk, the finished shapes unmistakable even with the scaffolding still up.

The three framed homes seen from the shared lane, scaffolding still up
All three homes framing out their roofs, trusses spanning overhead
Sheathed wall with window openings cut, weather wrap going on
Home 1's sheathed elevation, window openings cut and waiting for glass
Sep 26, 2026

Standing under the roof

Two days, a lot of lumber. Roof structure now spans the frames — stand on a third floor and there are joists over your head instead of sky. From up on Home 1 you can look down the whole row: sheathed walls glowing in the evening light, trusses marching across Homes 2 and 3, the quiet corner below. Ella walked the top floor under the new roof framing — the first time this build has had a “ceiling.” Sheathing now wraps both sides of the lane, and the three volumes finally read the way the renderings always promised.

Looking down the row of homes from Home 1's roof, trusses across Homes 2 and 3
Roof truss structure spanning the framed volumes
Ella on the top floor under the new roof joists
Golden-hour view of all three homes, sheathed and framing out their roofs
Sep 15, 2026

Windows find their views

Two milestones this week. Window openings are now cut into Home 1’s sheathed walls — each one placed exactly where the drawings put it, and each one already framing a view. Stand at an upper-floor opening and you get the second photo: treetops, morning light, the quiet street below. Meanwhile Homes 2 and 3 have their roof trusses up — the rooflines you’ve seen in our renderings are now real lumber against the sky.

Window openings cut into Home 1's sheathing, roof trusses on Homes 2 and 3
The treetop view through an upper-floor framed window opening
Sep 9, 2026

The lane between the homes appears

Something new today: for the first time you can stand in the space between the houses and feel it as a place. Sheathed walls now rise on both sides of the shared walk, truss decks span overhead, and the garage openings are framed and wrapped. Homes 2 and 3 carry their second-floor decks, and Ella walked the lane end to end — the path future neighbors will take home every day. Three independent homes, and now you can see the little street they share.

All three frames with garage openings framed and second-floor decks on
The shared lane between the homes, sheathed walls on both sides
Ella walking the lane between the three framed homes
Sep 7, 2026

Views from the second floor

For the first time, these photos weren’t taken from the ground — we shot them standing on the framed decks themselves. From up there you can already read the life of these homes: the treetop line, the quiet street below, the light coming through what will be the big windows. The stair tower now frames clear through three levels, sheathing keeps climbing, and the truss ceilings overhead show exactly how the floors stack. This is the view a morning coffee will get.

Three-story frame seen from the neighboring framed deck, September 7
Looking up the stair tower through three framed levels
Sheathing climbing the side elevation, third-floor walls above
Sep 5, 2026

The skin goes on

Home 1 stops being see-through: OSB sheathing now wraps the first two floors, with weather protection going on at the corners — the frame is becoming a shell. Up top, the third-floor walls stand ready for their roof. And the site has changed shape behind it too: Homes 2 and 3 are climbing into their second stories. From the neighbor’s fence line, it finally reads as what it is — three houses, coming up together.

OSB sheathing wrapping the first two floors of Home 1
Homes 2 and 3 rising into their second stories
The sheathed three-story frame of Home 1 from the fence line
Aug 27, 2026

The third floor climbs

Home 1 breaks into its third story — the tallest walls yet, standing clear above the sycamore branches in the evening light. The rebuilt staircase now runs from the slab all the way up, so you can walk the full height of the house for the first time. Behind it, Homes 2 and 3 have their first-floor walls up and floor trusses staged — three frames, one street corner, right on sequence.

Home 1 third-floor walls rising above the trees, Homes 2 and 3 framed behind
The staircase now climbing the full height of Home 1
Low-angle view through the three-story frame at golden hour
Aug 11, 2026

The stairs, resolved The cliffhanger, answered

Here’s the story: when the first staircase was framed, it met code — but it didn’t match the design we’d promised. So we made the call most builders won’t: take it out and reframe it right. The new stair is in. And so it never happens again, the full updated drawing set and renderings now live on a stand at the site — the crew builds from the exact pictures you see on this page. That’s what “built like it’s ours” means.

The rebuilt staircase, framed to the design
Ella reviewing the rebuilt stair against the plans
Updated drawings and renderings posted on site
Aug 7, 2026

The second floor tops out

Home 1 is standing at full two-story height — window openings reading against the sky, lumber staged for the next pour of work. And about those stairs… still to come.

Full two-story framed volume at 1708 Collier, August 7
Two-story framing with the Honics Development site sign, August 7
Aug 6 · evening

The stairs have a story… To be continued

Something happened on the stairs today — the kind of decision that shows what a builder is made of. We’re working it through with the structural engineer right now. Full story, with photos, in the next entry. Follow the build so you don’t miss it.

Aug 6, 2026

Two stories — the stairs are in

The staircase went in and the second floor is framing up against the treetops. Standing on the new deck you can already read the upstairs rooms.

Two-story framing with staircase in place
Second-floor deck with wall framing and street view
Aug 4, 2026

Second-floor trusses & decking

Floor trusses set across the first-floor walls and OSB decking going down — the first ceilings appear. Insulated panels staged for what's next.

Second-floor trusses and decking overhead
Aug 1, 2026

Beams & sheathing arrive

LVL beams and wall sheathing delivered — the structure that carries the second floor is on site.

LVL beams and sheathing staged at golden hour
Jul 30, 2026

First-floor walls across all three homes

Walls and door headers standing on all three slabs — rooms you can walk through for the first time. Ella walked every one of them.

First-floor wall framing across the three slabs
Framing from the street corner with heritage trees
Ella walking the framed walls
Jul 20, 2026

The first walls go up

Seventeen days after the slab pour, the site camera caught the first wall frames standing.

First wall frames standing on the slab, site camera

Want these in your inbox? Follow the build →

The build, in the open

Watch three homes come up.

Every milestone, dated and documented — from the approved drawings to the day we hand over keys. Follow along and you'll know the moment they're ready to tour.

Approved site development plan for 1708 Collier — three homes on the corner lot
Phase 01 · Design · Approved Apr 22, 2026

The drawings

Three 3-story homes designed for the corner lot — reviewed and approved by the City of Austin on April 22, 2026.

1708 Collier — the cleared and graded corner lot at Collier & Garner
Phase 02 · Site · June 2026

Clearing the lot

The original cottage comes down and the lot is graded; the heritage trees stay, protected at the root zone.

1708 Collier — the poured foundation slab on July 3, 2026
Phase 03 · Foundation · July 3, 2026

Foundation poured

Forms, rebar and plumbing rough-in passed the engineer's inspection, and the slab was poured on July 3, 2026 — captured on the site camera.

1708 Collier — Home 1 at three stories with Homes 2 and 3 framing behind, late August 2026
Phase 04 · Framing · We are here

Three frames go up

All three homes are sheathed and framing out their roofs — joists overhead on the top floors, trusses spanning the volumes, the row reading just like the renderings. Captured on our site walk, September 26, 2026.

UPCOMINGMechanicals & drywall
Phase 05 · Systems · Est. fall 2026

Wired & sealed

Electrical, plumbing, HVAC, insulation, then drywall — the homes get their skin.

🔔 Notify me when this happens →
UPCOMINGFinishes & reveal
Phase 06 · Finish & list · Est. spring 2027

Move-in ready

Cabinets, floors, fixtures, paint, roof decks — and the first tours. Listed shortly after.

🔔 Be first to tour →
The location

78704 — close-in South Austin.

A corner lot in one of Austin's most-wanted ZIP codes — minutes from downtown and Lady Bird Lake, walkable to South Austin's food, coffee, and music. Rarely a place you can buy brand new.

Minutes to downtown, Lady Bird Lake & the hike-and-bike trail
Walk and bike to South Austin restaurants, coffee & live music
Corner lot — light on two sides, two street frontages
Roof access on two homes for skyline-facing outdoor space
Map
Aerial
Community forum

Neighbors & public: say your piece.

This project lives on your block, so this space is yours too. Questions, concerns, ideas, support — post below and we’ll answer in the open. House rules: be civil, no spam; we moderate for respect, never for disagreement.

Follow 1708 Collier.

Pick the home you want and we'll send build updates plus an early heads-up before it lists — tour it before it hits the open market. Every home is available to buy or to lease; 3-year-plus lease reservations are open now.

Representing a buyer? Request the agent packet →

\n